Industry

ADC Group Comoti | Bucharest (RO)

We met an urgent delivery request in just 4 weeks with a little help from our suppliers, and thanks to the fact that our composite panels are always in stock.

Industry

Our Romanian customer, ADC Group Comoti (an R&D centre for plastics in the aviation industry), had to urgently replace the existing casing at its customer's location. There was only 6 weeks between order and completed installation. This plastic air handling unit was built and shipped in just under 4 weeks with the help of our suppliers and partly thanks to the fact that our panels are always in stock. 

This Liberty supply-exhaust unit (2,500 m³/h/2,300 m³/h) is equipped with a high-efficiency cross-flow heat exchanger, EC fans and ePM1 85% filters, and it more than meets the ErP2018 requirements thanks to an air velocity of 1.71 m/s. The external heat pump provides most of the hot and cold water supply for heating and cooling. All in all a future-proof installation delivered in next to no time.

Related projects

arla taulov
Arla Cheese Factory | Taulov (DK)

Industry

Well-known cheese factory can rely on our energy-efficient Liberty air handling units

amst 570x353
AMST Aviation (Aus)

Specials

Air handling unit for flight simulator setting at AMST Aviation in ...

A healthy climate in every building

Info required?

We supply Liberty solutions for each building type. Looking for solid advice? Contact our Sales Department!

knowledgecenter