Industry

ADC Group Comoti | Bucharest (RO)

We met an urgent delivery request in just 4 weeks with a little help from our suppliers, and thanks to the fact that our composite panels are always in stock.

Industry

Our Romanian customer, ADC Group Comoti (an R&D centre for plastics in the aviation industry), had to urgently replace the existing casing at its customer's location. There was only 6 weeks between order and completed installation. This plastic air handling unit was built and shipped in just under 4 weeks with the help of our suppliers and partly thanks to the fact that our panels are always in stock. 

This Liberty supply-exhaust unit (2,500 m³/h/2,300 m³/h) is equipped with a high-efficiency cross-flow heat exchanger, EC fans and ePM1 85% filters, and it more than meets the ErP2018 requirements thanks to an air velocity of 1.71 m/s. The external heat pump provides most of the hot and cold water supply for heating and cooling. All in all a future-proof installation delivered in next to no time.

Related projects

air products 570x353
Air Products | Botlek (NL)

Industry

A polluted, corrosive environment like the Botlek area near Rotterdam (NL) is no problem for the Liberty composite ai...

amst 570x353
AMST Aviation (Aus)

Specials

Air handling unit for flight simulator setting at AMST Aviation in ...

A healthy climate in every building

Info required?

We supply Liberty solutions for each building type. Looking for solid advice? Contact our Sales Department!

knowledgecenter