Specials

Research Lab of the Saudi Food & Drug Authority

High end laboratory located in Riyadh Saudi Arabia (KSA)

Specials

Full composite energy recovery plenum

The full composite energy recovery plenum for corrosive exhaust air holds air filtration and is prepared for an energy recovery coil that can recover energy from the cold air in the building. The recovered energy is returned to the air conditioning system in the building. A project in collaboration with our distribution partner Climasys Controls Dubai UAE.

Related projects

liberty arla small
Arla Cheese Factory | Branderup (DK)

Industry

Liberty air handling units in food version for cheese factory.

avantium 570x353
Avantium | Amsterdam (NL)

Industry

As a pioneer of fully composite air handling units, Rosenberg was t...

A healthy climate in every building

Info required?

We supply Liberty solutions for each building type. Looking for solid advice? Contact our Sales Department!

knowledgecenter