Swimming Pools

Vita Scheldebad | Temse (Be)

The project comprises an integrated 30-year (DBMEE) contract for the design, construction, maintenance, energy and operation to be carried out by main contractor Cordeel. T.

Swimming Pools

The project comprises an integrated 30-year (DBMEE) contract for the design, construction, maintenance, energy and operation to be carried out by main contractor Cordeel. The Vita group manages several swimming pools and strives for an innovative concept of sports and swimming pool facilities. The Vita Scheldebad has a competition pool (25 x 21m with 8 lanes), target group pool (15 x 8m), paddling pool, family slide, 3 herbal baths, catering business with indoor playground and fitness room.

The ait treatment system

The usual presence of chlorine and moisture in the pool air largely determines which materials can be used. Particularly if service life and maintenance guarantees have to be provided.

The air groups

The plastic Rosenberg Climate Technology air groups were chosen for the air treatment. Our air groups prove to be the most sensible choice for swimming pools time and time again. Not only because of the standard 12-year warranty on the casing (without conditions), but also because of 30 years of experience with swimming pools and the highest thermal properties (T1/TB1 according to EN1886), which provides energy benefits, especially in the long term. The air units are supplied fully pre-wired and provided by the customer with their own controller, which can communicate with the local Building Management System via Modbus or an analogue signal.

The air groups are equipped with epoxy-coated cross-flow exchangers that return the thermal energy of the swimming pool air to clean and dry outside air. A hot water battery provides the final heating for the outside air and return air mixture. The filters comply with the latest filter standards and thus ensure a clean and fresh indoor climate. The restaurant with a view of the Scheldt has a slight overprint. The minimal presence of chlorine smell in the restaurant is therefore excluded. The space under the restaurant is fully equipped as a fitness room. The air management is arranged with one air group. 7,000 m3/h supply and exhaust with cross-flow exchanger including heating and cooling battery provide an excellent sports climate.

THE END USER

“The installation fits well. We are very satisfied with the end result.”

Maarten Bouwens – Swimming pool Manager

Related projects

innovocean 570x353
InnovOcean Campus | Oostende (Be)

Offices

Our durable Liberty air handling units were chosen for this project because of the corrosion immunity of the units.

comoti 570x353
ADC Group Comoti | Bucharest (RO)

Industry

We met an urgent delivery request in just 4 weeks with a little hel...

A healthy climate in every building

Info required?

We supply Liberty solutions for each building type. Looking for solid advice? Contact our Sales Department!

knowledgecenter